We would have a hard time on the worksite without the portable chiller

For the past few weeks, my co-workers as well as I have been doing work on a construction project downtown.

The modern office building will have 150 offices as well as conference rooms.

Right now, we are putting up drywall in the building. The building has 7 stories as well as we are only three floors through the installation task. That building has not been supplied with Heating, Ventilation, as well as A/C equipment yet, so we have been using a portable chiller to cool the building… It’s 95 degrees outside and the humidity is 100%. It’s truly impossible to focus on the work with such drastically high heat as well as humidity! My co-workers as well as I would not be able to do this work with the sizzling hot temperatures if we didn’t have this portable chiller. The foreman on this task rented a 500-ton portable chiller. It showed up on the back of a semi truck. The portable chiller is actually locked inside a fenced section right next to the building. There are very large tubes running from the water cooled chiller to the building. The large tubes bring air through the building. In order to save time as well as currency, we only cool just one floor of the building at a time. All of the tubes are blowing cold air into the third floor at this moment. All of us are halfway done with the drywall on that floor. Monday, we will move the portable chiller tubes to the next floor up. That section will be easily cool while we do the work with the drywall. The portable chiller provides a sizable amount of cool air as well as comfort while we take care of the work and it gets finished more rapidly when my coworkers as well as I are extremely comfortable.

steam boiler rental

By admin

Leave a Reply

Your email address will not be published. Required fields are marked *